A ten minute self audit for plant leaders

Your floor is telling you where the money is going. Put a number on it.

Fifteen questions across the five S's, plus a few numbers only you know about your operation. You get a score per S and a dollar figure for what inventory, searching, downtime and rework cost you every year.

5S Floor Cost Check

Score the floor as it runs today, not as the board says it should

Answer for one line or one plant. Be hard on yourself. Nobody sees this but you.

Annual cost of floor friction, from your numbers

$0

5S score 0 / 45

Demo build. The form is not wired to anything yet.

How the number is built. Every figure comes from what you typed in. Inventory carrying cost = inventory × carrying rate. Labor friction = minutes lost ÷ 60 × loaded rate × headcount × 250 days. Downtime = hours per week × 50 weeks × cost per hour. Scrap and rework = percentage × manufacturing cost. The 5S score does not change the dollars. It tells you which bucket to walk to first.

The part nobody sells you

5S will show you where it hurts. It will not tell you what is actually in the way.

A clean, labeled, shadow boarded floor is good. It is also where most programs stop. Ninety days in, the tape is scuffed, the audit sheet is a formality and the real limiter is exactly where it was: one machine causing most of the jams, one component behind most of the stops, a maintenance crew spending nearly all its hours reacting.

Factories do not underperform randomly. When output is below designed capacity, something inside the system is limiting it. Workarounds, expedite fees and constant firefighting do not solve that. They hide it.

What a week on the floor has found

Real plants. Real numbers.

89.98% → 99%+
On time delivery

US hardware manufacturer. Standard lead time cut from 13.1 days to 10, with 99.93% of units passing final inspection.

6% → 80%
Overall equipment effectiveness

First of its kind automation line. Stabilized through downtime driven prioritization, preventive maintenance discipline and spare parts strategy.

2,000+ → 1,200
Labor hours per machine

Semiconductor capital equipment transfer. Lead time from about 12 months to under 4. Target volume beaten in the first full year.

43%
Finding

One machine caused 43% of all jams on a line.

42%
Finding

One component sat behind 42% of stops.

831
Finding

Stoppages in a period that nobody had logged.

What happens after the score

One week. Me on the floor. A list with dollars next to every line.

We do not assume. We observe.

The work starts where the order enters the business and follows it through shipment. No conference room analysis, no generic recommendations. The system as it is running today.

  • Flow and constraint observation
  • Line and process walk throughs
  • Output, quality, downtime, changeover and delivery patterns
  • Operator interaction, labor loading and support response
  • Equipment and automation assumptions where relevant

What you leave with

You end the week with a list of what was found and what each one is worth in dollars: costs you stop spending and capacity you free up. You have that before you spend on more people or more equipment, and you hear what it would cost to have it fixed.

"In manufacturing, there is a big difference between a system that works and one that actually performs."
Tim Corcoran, Trueworx Manufacturing

Who is behind this

Tim Corcoran built his background in automation equipment design and bringing up complex manufacturing systems.

Pilot production, production ramp and line stabilization across consumer electronics and complex capital equipment builds. On the floor building automation equipment, bringing pilot systems online, troubleshooting failures during bring up and leading engineering and manufacturing teams across multiple sites globally. Real improvements depend on the team being involved in the fix and carrying it forward after the work is done.

Talk to Tim about your score

If the operation is stable, predictable and performing the way it should, you probably do not need this. If it is not, this is where the work starts.